WAREHOUSE DIGITAL TWIN 3D

MHE Optimization Challenge • playkaizen.com

CAPEX Budget
€35,000
€
Target Flow
45 PLT/HR
🎯
Live Output
0 / 45 PLT
📦
Facility Geometry
H:2.0m | A:3.6m
📐
Safety & Fit
100%
🛡️
Digital Twin Clock
08:00 (READY)
⏱️
SCENARIO 1

CROSS-DOCKING HUB

High-velocity floor transshipment from Inbound Receiving to Outbound Shipping. Wide 3.6m aisles and 2.0m low racks—prioritize horizontal transport speed and unit-load wrapping without over-investing in tall high-reach trucks!

Max Rack: 2.0m Aisle: 3.6m
1. Transport 2. Positioning 3. Unit Load 4. Storage & Retrieval
SIMULATION SPEED:
HOURLY OPEX €0 / hr

Deployed 3D Fleet (0 / 16 Units)

(Click unit on floor or below to remove for 100% refund)
No MHE deployed yet. Select an equipment model on the right and click the 3D warehouse floor (or "Deploy Unit")!
TRANSPORT

Electric Rider Pallet Truck

€4,500
📍 Install In: 1. TRANSPORT ZONE (Inbound Docks & Transit Aisles)

High-speed horizontal dock-to-staging transit

Max Lift: 0.2m
Min Aisle: 2.0m
OPEX/hr: €20/hr
Flow Rate: 22 plt/hr
TRAVEL SPEED3.2 m/s
CUBE / LOAD RATINGMEDIUM
✔ STRENGTHS (PROS)
    ✖ TRADE-OFFS (CONS)
      ✔ Compatible with current warehouse geometry

      MHE Equipment Catalog (4 Categories)

      Select to inspect in 3D